As indicated in our first announcement dated 28 September 2022, the Open Subscription Period for additional access capacities at Fos Tonkin LNG terminal for 2023[...]
Elengy and its subsidiary Fosmax LNG are committed to promoting the access to the European natural gas markets through LNG infrastructures. Fosmax LNG launched in[...]
Following our first announcement dated 17 March 2022, the Open Subscription Period for additional access capacities at Fos Cavaou LNG terminal for 2022, 2023 and[...]
Elengy and its subsidiary Fosmax LNG wish to offer additional access capacity by technical debottlenecking of the Fos Cavaou LNG terminal for the years 2022 to 2024[...]
Following our first announcement dated 2 September 2021, the Open Subscription Period for additional access capacities at Fos Tonkin LNG terminal for 2022 (“OSP[...]
On 30th August 2021, Elengy’s Fos Cavaou terminal (Marseille) welcomed the LNG carrier Gaslog Savannah for the 100th ship reloading operation performed at its[...]
Thanks to an optimisation of the facilities, Elengy is offering to the market additional access capacities at Fos Tonkin LNG terminal in 2022: +2000 GWh from January[...]
Elengy has resumed the gas send-out in to the transmission grid from the Montoir-de-Bretagne LNG terminal.
The schedule of flows and stocks at the terminal as well[...]