Following our first announcement dated 2 September 2021, the Open Subscription Period for additional access capacities at Fos Tonkin LNG terminal for 2022 (“OSP[...]
On 30th August 2021, Elengy’s Fos Cavaou terminal (Marseille) welcomed the LNG carrier Gaslog Savannah for the 100th ship reloading operation performed at its[...]
Thanks to an optimisation of the facilities, Elengy is offering to the market additional access capacities at Fos Tonkin LNG terminal in 2022: +2000 GWh from January[...]
Elengy has resumed the gas send-out in to the transmission grid from the Montoir-de-Bretagne LNG terminal.
The schedule of flows and stocks at the terminal as well[...]
The repair works of the gas pipe are now completed. Elengy's teams are starting the works to progressively resume the gas send-out into the transmission grid.
After detecting leak on the insulating joint in the gas pipe linking the LNG terminal to the transmission grid, Elengy, in accordance with its procedures, informed[...]
The law of 5 September 2018 "for the freedom to choose one's professional future" establishes for all companies an obligation of result on equal pay between women[...]